a)If column dimensions are 250*400mm , what will be
cutting length for 8mm stirrups and how to calculate it? b)
If beam dimensions are 200*400mm , beam coveris 25mm , slab
cover is 20mm , what will be the cutting length for
stirrups? c)Column dimensions are 250*400mm , reinf. is
12nos. bar of 16mm dia , stirrups provided are two legged,
what will be the length of each ring?
Regards
Answer Posted / ajay
sir , my name ajay kumar ,working on site i also had the
same problem of estimation , but sir ur answer was so nicely
explained , im very thank full to u for ur valuable and
precious information, sir can i no ur email id and no so i
can get some knowlege from u ?
my email -ajaykapse2@gmail.com
| Is This Answer Correct ? | 6 Yes | 10 No |
Post New Answer View All Answers
WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?
WHAT IS YOUR EXPECTED SALARY?
how many material required for brickbat water proofing of toilets.
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
60-70 grade of Bitumen is VG-30 ?
What are the types of slump?
What is Architect-Prepared Contract?
When column of building is abutting the boundary line,then suitable footing advised is
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.