Answer Posted / k.prakashchandra
This relay is used for stator earth fault protection for
generators.The vector sum of three phases in all corners of
delta connected PT secondaries is zero.One of the corners is
taken through a voltage relay.Operation is as above.
Is This Answer Correct ? | 9 Yes | 1 No |
Post New Answer View All Answers
when we gave dc supply to 220v dc motor its rpm is 1200. then we gave 180v. how many rpm of its motor. gave answer with calculation at my ID.... ravizak@ymail.com
what r substations?what r there work?why voltages r incresed and then reduced during distribution of power
how to discharge 3 phase power factor correction capacitors
define reflection method?
What are the disadvantages of thermal power plant?
How to check 11000/1.732 to 110/1.732 Potentila transformer (PT)?
Explain M Var? Which types of problem occurs when reactive power increase at the time of full load of plant and at the time of synchronize of plant?
On what basis the the size of Lightning arrester for buildings are selected ?
how to find the torque of the single phase synchronous motor by doing an experiment
Write the force balance equation of m ideal mass element.
What is the difference between UPS & inverter ? which UPS is better and whos got the edge ? what is the difference between & inverter ? which UPS is better and whos got the edge 12 V , 24 V , 36 V etc what are the advantages of 12 V, 24 V , 36 V etc and what are the disadvantages of 12 V, 24 V, 36 V etc thanks
Why we are going for converter transformers for DC drives application instead of distribution transformer?
when will be the iocl interview results i faced interview on 8th september 2008 iam from electrical branch i faced interview for the post of electrical engineer??????????????????????//
Please help me regarding my one concern. - During earth pit testing we noticed that the Clean earth pit and dirty earth pit showing continuity (Resistance value - 5ohm) . I want to know that if both earth pit have separate location and there is not internal looping between PIT then why such continuity is showing on it . Because of this issue the field side all earthing point showing short. In PLC panel we are providing two types of earthing cable which is coming from separate earth pit (Clean and Dirty earth pit) because of earth PIT showing short our PLC is not complying spec . please help regarding this issues.
54 Comments Alok and Bhanu play the following min-max game. Given the expression N = 38 + X*(Y – Z) where X, Y and Z are variables representing single digits (0 to 9), Alok would like to maximize N while Bhanu would like to minimize it. Towards this end, Alok chooses a single digit number and Bhanu substitutes this for a variable of her choice (X, Y or Z). Alok then chooses the next value and Bhanu, the variable to substitute the value. Finally Alok proposes the value for the remaining variable. Assuming both play to their optimal strategies, the value of N at the end of the game would be?