How cost will flow from delivery(with out reference order)
to billing?

Answer Posted / sanjay ghosh

in delivery without reference order we are creating delivery with t-code VL01N0.
and then putting delivery type as LO.
and item category is DLN.
in this pricing comes.
(this is not normal delivery as we do in vl01n where there is no price)

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is sap posting period?

680


Define to which organizational element is central in shipping?

753


how to configure Supply chain management

1676


I have a shopping mall. If a customer comes to my mall and if he purchase or not anything I give him pen free. How we map it in sap?

1613


what is a distribution chain ?

634






one of interviewer asked me this requirement please tell me anybody? Issue: the problem faced by us right now is,when there are more than 2 route codes available, users can select a wrong route code which is a longer route for the destination, the physical shipment can still go through a shorter route, but company will end up in paying more. Requirement: user maintained route list, the user will maintain a master from which route should be picked, users should be able to enable or disable a particular route. Thanks in advance

1208


What are the examples of global settings?

650


How to disable the 'import all' button on stms for the queues in sap? : transportation management

798


Name at least five features that you can control for the schedule line category? Relevance for delivery, availability check, transfer of requirements, goods movement, purchasing and incompletion log.

626


What’s forward scheduling and backward scheduling activator? There’s a concept called forward scheduling and backward scheduling logic when you do an availability check whenever your order is created system will check whether it’s forward scheduling or backward scheduling, if it’s fatal we have a concept of how is it working, how is that you created as part of your available promise concept? Whatever that date is being considered as part of the logic, whatever the date that is configured or we maintain the data to say know that system tell to create this output back scheduling

434


PRICING…… I have a requirement where I have a fright condition which is a header condition for the whole document, I will be maintaining the fright condition recorder (header level) because it’s header condition, now the requirement is if I want to have 5 conditions to be calculated for each item because let’s say I have 5 line items, I want to see how the side calculated first of each item so what’s the best way to take out that out of the system in standard configuration, how can we achieve this?..... REPEATING question (I have a fright condition, now fright condition is a header condition, now my requirement is I wanted to applied that fright condition each line item level so fright condition applies a header level but my requirement is I want to see each and every line item should also get this fright condition on the value of the item, let’s say my fright is $100 so I have 5 line item, each item has the 10 10 10… so build on that value I want to purpurnate the fright condition, how can we achieve this from the standard system configuration stand point?

533


What is invoice correction?

576


How shipping point is determined?

625


Define sales document types?

678


Explain ‘business area’?

613