Generally In transformer Tap Changer on HT side, but I have
seen in 66KV side in 220/66 KV, 100 MVA, Areva make
transformer. Why ?
Answer Posted / gaurav
Check again it will be in Ht
side only.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Define damping ratio.
Which level of the Transformer oil got dielectric strengh? And why?
What is pd controller?
how we can find of current direction(supply comming/out going direction) when a transmission line passing through sides.
which phase is preferred for connecting 1 phase vt used for synchronizing OHL? WHY?
How o select the electrical fuse?.What are its characteristics.How to select the material od fuse?
I have made a 3 phase thyristor full bridge rectifier. But at the moment it is working only for the half bridge operation. Both the half bridges are on operation separately but when i put it into full bridge operation the oscilloscope output is zero. I rechecked that the pulses are correct for each thyristor. what could be the possible reason for this?
What is force on a conductor in a magnetic field ?
How to design the earth grid for lightning protection in an industry
In our plant we have installed new MCC with ELR and CBCT which is detecting some leakage current in the system but it leading to some confusion when to check that in which feeder which is drawing current we put off the whole panel itself but still CBCT detecting some leakage current so can anybody ans me , where i am going wrong or how to detect whether its actual leakage or CBCT malfunctioning.
Why ground terminal is used in pot meter 10k ohms
hi, in the event earth grounding is not available in a project, is there any other way to make the elcb work? fyi, i have an instant water heater (6.5kw) installed, however if there is grounding in the heating element inside the heater assembly, i will get grounded. thank you in advance to those who will answer my question.
WE HAVE THE DC RECTIFIER 1500A, INPUT VOLTAGE IS 3 PHASE. HOW TO CALICULATE THE LOAD? 3 PHASE SIDE EITHER dC SIDE. PLEASE SUGGEST ME
When we have earthing mesh or underground earthing network in industrial plants, weather we have NT-S or NT-C-S kind of earthing system, so eventually weather we must use 4 or 5 wire in 400 volt level (For example 3×150+70 mm2 or 5×150 mm2) in this connection I would like to know exactly the paragraph of IEC or IEEE number
how does a shunt reactor maintains the bus voltage???