why ct is testing using dc.. y cant we use AC insted of dc
on POLARITY TEST.
Answer Posted / raghavendran.r
I think for Polarity testing AC is being used in power transformers.Let me explain the circuit for the same .Keep the secondary side open.But short one of the terminals of the secondary side with the primary side, so that the primary current flows through the secondary.Now adjust the primary voltage using variac and note down the secondary voltage.If primary voltage is greater than secondary then the polarities are different.
If secondary voltage is more than primary then the polarities are same.
This is how polarity is tested in power transformers and Motors.
The same may apply to CT also.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
what are the sample questions asking to the test cunducting for electrical superwising lisence test?
What are the components connected in between the power supply coming from an electric pole to HT & LT Panels in a large commercial building or how the power supply connected from Electric pole to Transformer & then to the HT & LT panels of a building? Please send me answers via mail, my id is yogiagarwal@gmail.com. If possible, please give a line diagram.
How impulse levels are calculated that for 11kV impulse is 75kvp, for 24kV impulse is 125kvp ?
Can anybody inform me about the pattern of ECIL GET( Graduate Engineers Trainee) interview for Electrical students? Will there be HR round as well? I thought of preparing for 2 to 3 subjects thoroughly. Will it be sufficient? Please share your thoughts.
in science exhibition how lamp can blink when you clap near the lamp ? thank you
Fantio of tranformer
What is distance between electrical panel to land ?
define hysteresis loss, eddy current loss and windage loss
DESCRIBEPNEUMATIC SYSTM OF ASH HANDLING PLANT
how does a shunt reactor maintains the bus voltage???
In which working principal temperature transmitter work.explain in detailed.
How equivalent impedance is calculated in thevenin theorem?
Operation carried out in thermal power stations?
what you have to see after one week or month from the day of installation of transformer ?
"TRANSFORMER MODELING AND ANALYSIS" MEANS WHAT AND WHICH TOPICS U READ IN THIS