how to prepare analysis of hire charges for 62.5 KVA
generator
Answer Posted / shyam.bh
It is a lengthy & detailed process for rate analysis of
equipment.
It is done by the CWC (Capital cost & Wages of Crew) guidelines.
Hourly charges of 62.50 KVA DG
basic cost = 4,00,000.00
add transportation & insurance charge = 32,000.00
Other taxes = 12000.00
Book value of machinary = 4,44,000.00
Rated life = 08 yrs
Rated life in hours = 20,000hrs
Yearly depreciation of the equipment = 49950.00 (cwc
guideline)
hourly depreciation = 20.00 -----A
Interest on capital investment/hr = 16.00 -----B
Repair & maintanance@120% = 24.00 -----C
Fuel charges for operation = 0.026*62.50/0.746*3.04*35
= 232.00
Oil & lubricants @ 25% of above = 58.00
sundries @ 10% of repair charge = 2.00
Total fuel charges = 292.00 ----D
Labour charges
rated life / month = 12000/144 = 166.67 hr/month
regular worker
operator = 8,000.00x0.80 = 6,400.00
mechanic = 10,000.00x0.125 = 1250.00
Total L/C = 7650.00----a
Casual worker watchman = 3000x0.125 = 375.00 ----b
Total L/C = 8025.00
Add hidden charges @ 80% on 'a'& 55% on 'b' =6326.25
Total L/C = 14351.25
Hourly L/c = 86.10 ----E
therefore the hourly charges of a set 62.50KVA
= A+B+C+D+E = 438.20 Rs
| Is This Answer Correct ? | 10 Yes | 0 No |
Post New Answer View All Answers
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
what is the weight of 10mm,20mm,40mm aggregate
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress
What is difference between combin footing & rapt footing
what is the max. area can we apply the plate load test ?
what is the basic difference between Coloumn & Shear Wall
Explain different types of rcc pipes.
What year was the keystone power plant in Indiana County constructed?
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
Define What does civil status mean?
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.
What are the composition of a landfill?
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor