Answer Posted / engr ali
HAHAHA!!!
wrong answer by serail no 8(guarav naik)
a silly answer
b technical like professional engineers!
not like technicians
got the point!hopefully so.
| Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
bus bar design conditions and sizing pls tell me quickly
1. What is maximum permissible distance between smoke detectors ? 2. How do we decide number of smoke detectors required in a large office, warehouse, hall etc ? 3. What should be maximum height of smoke detectors ? 4. Where do we use heat detector, optical smoke detector, temperature sensitive detector ?
# 4 hi friends i m from electrical branch and seeking for tech. + apti. both papers of hpcl plz get it available as soon as possible my email id is sumit_lig189@yahoo.co.in
what are the steps involved in generator load test?
Whether it is possible to measure energy at the input of rectifier transformer (12 pulse with very high odd harmonics)
Is it required to lay 2 runs of GI wires along with armoured cables from one power DB Machines of higher rating?
what rectifiers is and what are the types of rectifiers?
What is the function of NGR for the parallel operation of alternator? whats happen when different rating of alternator are running with parallel?
How to calculate the fuse rating depend upon the DC circuit?
how to select the no. of brushes in a lap winding?
is it necessary to earth the rmu before cutting off the transformer winding?if yes why?
draw a circuit diagram connecting transformer OLTC- RTCC- VCB-Marshalling Box otherwise Explain in words
how will reduce the voltage. if 12volt/250ma transformer toreduce 6 volt
What is domestic transformer? Draw the connection of domestic transformer.
how to differentiate a mpcb,mcb with a contactor? Explain their working operation