Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why normally Generator rating are between 11Kv to 22Kv?

Answer Posted / gaurav tripathi

because mostly power is generated between this voltage

Is This Answer Correct ?    7 Yes 17 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Define relative stability.

1042


describe the constructional features of an auto transformer and its principle operation

2341


I am inpecting a 10kVA UPS what tests should i do and should i observe?

2206


What is the need of earthing transformer for delta side of a transformer. (Think of a line section between a star/delta transformer at a grid substation and delta/star transformer at a village. An earthing transformer is there at the delta side of the star/delta transformer at grid substation). As there are no ground reference there will not be fault current if a one phase is grounded. Further L-L phase will be sensed by the primary side of star/delta transformer as a L-G fault. So why an earthing transformer is required at delta side

1443


A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.

1767


In a flange coupling, the flange bolts are designed for

1104


What is the BS(British Standard)code for 11kv motor

4962


How to back charge the Gas turbine generator

2139


How do we arrive at selecting reactive capacitance value as 30% of h.p rating of motor?

1822


what is the differences between microprocessor and general purpose computer

2164


what is Fault level? why it is calculated? how will u decide same for our plant?

2035


What does the kvar means?

1186


Where is servomechanism used?

1191


Explain in details how you would react to an unexpected incident when your supervisor or manager is not around to give instructions?

8056


how many current required for hypo test

1956