Answer Posted / b.srinivasarao
AVERAGE SIZE OF SAND AND LIMIT IS 2-3.5 AS PER MORTH
SECTION 1000
| Is This Answer Correct ? | 7 Yes | 3 No |
Post New Answer View All Answers
what are the changes in concrete pour height as per IS 456, 2009?
i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like
What tor stands for in tor steel?
how much shouid be the rate for ready mix concrete per cubic meter
How to calculate material and labor required for 100 m2 plaster?
who to find building iron rod strenth
I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
What is meant by dimensioning?
how u design STAGING for Superstructure in BRIDGE construction?
Forces in a Shear Wall are in plane or out of plane ?
When column of building is abutting the boundary line,then suitable footing advised is
what is grade intersection?