what is procedure to find the volume of material in M20
concrete?
Answer Posted / i.rajamohamed. p.s.y.e.college
M20 ratio is 1:1.5:3( TAKE 20mm aggregate)
(i)add ratio= 1+1.5+3= 5.5
(a) volume of aggregate = 1\7*1.57 = 0.22m3
(b) volume of sand =1.5/7*1.57= 0.33m3
(c) volume of cement =3/7*1.57 = 0.67m3*1440=964 kg.
(note: 1.57 for 1m3 box)
| Is This Answer Correct ? | 5 Yes | 16 No |
Post New Answer View All Answers
What is the worlds largest concrete dam?
How to calculate canal slope curvature qty!
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
List out some of the common problems that architect have to tackle it?
What is the use of extend command?
How to calculate laplength for 3 floors
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
The largest size of paper used in plotter to print the drawing made by Autocad .
What is the difference between engineering stress and true stress?
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
how is the reinforcement is distributed in triangular slab
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
what is the max. area can we apply the plate load test ?