IF we want to replace I/C bay at our 220 kv substation which
is of 140 mw load capacity bay to be replaced by 400 mw
capacity bay.other than CT(1200/1) what are the other
equipment i have to replace.
Answer Posted / k.prakashchandra
cb,isolator and conductors
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
how to find the resistance and gap volatage of the diode??
why different series of vfds (like allenbradley)are used in industry ?
which network topology offers the greatest level of tolerance?
how to calculate the surge level of surge suppressors related to the SF6 cicuit breakers?
Which material is used for the core of a transformer and why?
in the directional overcurrent and earthfault protection,normally we are setting the angle 45 deg lead for phase fault overcurrent and -45 deg lead for earthfault fro forward direction.but both the fault are operating on the same angle region only.why?how the relay will response?
What will happen if we introduce negative feedback to a control system that uses a positive feedback?
power transmission pole used one support , that only for support or earthing
1.what is the funtion of chiller primary & scondary pumps. 2.what is the use of distribution lines & Types. 3.what is the use the thermal power stations & how much capacity.
What is core CT & it's function?
how to set relay setting? and example calculation...
For RCD (Residual current device) Icu is defined. How i can find Ics for them?
What do you mean by pull of electromagnet?
How many types of colling system it trformers?
what will happen if earth of 33 kv cable (earthed system) is not connected to earthing pit?