what is procedure to find the volume of material in M20
concrete?
Answer Posted / er z h ansari
It depends on concrete mix design.
| Is This Answer Correct ? | 4 Yes | 11 No |
Post New Answer View All Answers
IS code for grade of concrete for bamboo lintel????
What are the RISKS during the project construction?
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.
how much need sand and cement for 1 cft roof construction?
How to calculate density of 40 mm coarse aggregate, in mixing ration 1:1.5:3? Please explain calculation for density
What is structural frames or systems?
Who built the sears tower?
States some of the tool bars used in cad?
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
Reinforcement details at hinged joint
How do you prepare Material Recovery Statement for deduction from contractors bills?
List out some of the checking’s, done at the completion of construction?
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
What is semirigid connections?
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required