hi,
how would i run job1 then job 3 , then job2 in a sequence of
job1 ,job2,job3.
Thanks
sunitha
Answer Posted / vijaya
Hi
U can run the job1 then job3 by two methods by using trigger
conditional or by nested condition activity.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
which r the connectors used in san?
Differentiate between datastage and informatica?
What is apt_config in datastage?
create a job that splits the data in the Jobs.txt file into
four output files. You will direct the data to the
different output files using constraints. • Job name:
JobLevels
• Source file: Jobs.txt
• Target file 1: LowLevelJobs.txt
− min_lvl between 0 and 25 inclusive.
− Same column types and headings as Jobs.txt.
− Include column names in the first line of the output file.
− Job description column should be preceded by the
string “Job
Title:” and embedded within square brackets. For example, if
the job description is “Designer”, the derived value
is: “Job
Title: [Designer]”.
• Target file 2: MidLevelJobs.txt
− min_lvl between 26 and 100 inclusive.
− Same format and derivations as Target file 1.
• Target file 3: HighLevelJobs.txt
− min_lvl between 101 and 500 inclusive.
− Same format and derivations as Target file 1.
• Rejects file: JobRejects.txt
− min_lvl is out of range, i.e., below 0 or above 500.
− This file has only two columns: job_id and reject_desc.
− reject_desc is a variable-length text field, maximum
length
100. It should contain a string of the form: “Level out of
range:
what should be ensure to run the sequence job so that if its get aborted in 10th job before 9job should get succeeded?
What is the purpose of interprocessor stage in server jobs?
In work load management there are three options of Low priority, Medium priority and High Priority Jobs which can be used for resource management. why this feature is developed when there is already jobs prescheduled by scheduler or autosys. what will be the use of workload management then?
What are iconv and oconv?
What is difference between server jobs & parallel jobs?
What is difference between symmetric multiprocessing and massive parallel processing?
im new to this tool im now at project plz tell me step by step process how to design plz help me i wnt to go with exp for job plz give me d proper design and explination
Why we use surrogate key?
whom do you report?
What are sequencers?
What a datastage macro?