In 120 m high RCC Chimney shell construction how we can
calculate the inner and outer dia of shell at every +1 m
level as this shell is inclined from bottom to top.
Answer Posted / n.c.kapri
in slipform technology ,we do a marking in spur beam from
center.drop the shawal from there and measure the distance
from inner wall to that marking,it will our I.D
ex:marking at 2.9m
distance from inner wall to that marking .475m
so inner dia =2.9+.475
=3.375m
now add the wall thikness in I.D & get outside dia
| Is This Answer Correct ? | 7 Yes | 1 No |
Post New Answer View All Answers
what is the list of building construction equipment & teir output?
how to convert sand in Cft to Kgs
difference between fc and fc'?
How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction
How will be cutting in timber plate size 600*400 column size
What is the biggest dam in america?
What is the Hardness of M-40 grade concrete, general and theoratical
Explain what are the phases inspections are done by local authority while construction?
What happens to Load at yielding ?
Why was the empire state building made of steel?
Basic questions of civil engineering
Define graphics window?
reinforcement slab, beam and column formulas?
plumbing CPVC fitting FTE Brass full form
What difference comes in constructing of house and a housing complex like society