What is meant by 'zero value' in quantity surveying.
Answer Posted / k.prakashchandra
work yet to be taken up
| Is This Answer Correct ? | 43 Yes | 16 No |
Post New Answer View All Answers
What is Grid floor and mention its advantages ?
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
crank types
List out some of the software program that can be useful for architect?
which method is used in semi-rigid connection design??
how to design and calculate materail quantity for concrete speedbreaker ?
how we calculate the vol.of wet concrete..?
how to check and keep control on the wastage of material at site
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
load combinations how many types for staad design purpose?
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
why do we not deduct volume of steel to find actual volume of concrete in practical???
what is meant by csr in foundation? what is sbc?what is meant by contour line?
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
How to calculate carrying capacity of the existing water supply trunkmain