How to calculate the cement, sand quantity for plastering?
(10'x10')10mm thick ratio 1:5. wht"s the formula?
Answer Posted / s.gopal
10 FEET =3.048m
3.048*3.048*0.010=0.093cum
sand required =0.093cum(3.28 cft)
Cement req - 1/5*1440*0.093=26.8kg
| Is This Answer Correct ? | 58 Yes | 52 No |
Post New Answer View All Answers
How much cement is require in one sqft area in a G+3 residential construction.
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure
How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.
Define current ucs?
Which purpose we use deck anchor in bridges?
How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?
What are the applications of modulus of elasticity?
What is an ortho mode?
What is zoning permit?
what r you reqired for concrete baching plant?
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
Special thing in designing a overhead reservoir ? which is different from an ordinary design
to draw bm diagrams for portal frames under different loadings//
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.