Answer Posted / jalandar
RCC Dam.
Earthen Dam.
Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
pls tell me about method of cutting length of ties column
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
how to find out hard strata in bored pile when the DMC method adopted.
pls give me ans to ACT formula cube testing porpuse
explain what do you mean by the property development.
why +1 to be followed for calculating the no of bars in BBS. Please explain
What are the basic use of runners and standards of pipelines?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
what is labour consume factor in residential projects
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
explain fie benefits of using standard terminology in the measurement process
Which is the best book for building construction?
how do you calaculate the total steel quantity of an rcc building using thumb rule?
What are the different approaches in designing the floors of the service reservoirs?