why the under of transformer platform is filled with rock stones.

Answer Posted / suresh babu

first to prevent the stagnent of water under the transformer
second vibration withstand
third low resistivity i mean rock stones forms low
resitivity path

Is This Answer Correct ?    2 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Can any one provide the inspection procedure of MIMIC for VFD panel? Details: If someone wants to have a mimic in the VFD panel what are inputs considered for the mimic(like on,off,trip) whether we are able to add speed variation in the mimic(if so how can we get) and what are the parameters to be checked in the MIMIC during inspection?

1736


how much GROUND & NEUTRAL VOLT maintain in data center.

1533


How test for Ddo vector group test condition?

1961


What is meaning of out of phase (making & breaking) capacity And how to calculate

1617


i wasted one year for the job after completed my btech what can i say about 1year time in interview

1591






Classify driling machines.

696


In electrical what is earth(ground)connection, wht is the importance of it, why it is recomended to maitain below 3VAC between Neutral and earthspecially in PLC used machines?

1751


Explain the term parallel path in dc machin ?

1756


how does ELR works? explain

2146


If increased the frequency up to 1000 then what changes shows in voltage?

1967


The advantages of Magnetic flux leakage technique over Ultrasonic technique for non distructive testing of material.

1488


what is dry and wet frequency withstand voltage? why & where it is used??

1772


how are reversing the direction of rotation of dc motor

1258


IF DISTANCE IS 100METERS B/W AMP.METER AND CURRENT TRANSFORMER WHAT WILL BE AFFECT IN ACCURACY .METER CAN SHOWING ACCURATE CURRENT OR NOT IF NOT WHAT CAN I DO TO GET 100% ACCURACY.

1411


what type of questions are asked and howmwny questions belong this catagory?

1708