Answer Posted / munish
Maximum generating voltage is 15.7kv in Tehri hydro
(utterakhand)
Highest capcity of commissioned m/c is 250MW in Tehri
& some other power houses and also in Jp project karsham
bangto in kinnor HP. which is in errection stage.
Is This Answer Correct ? | 0 Yes | 5 No |
Post New Answer View All Answers
In synchronization circuit what is the function of Interposing voltage transformer(IVT)and Reverse voltage transformer(RVT)
why we used ZNO in Lightning arrester.
On a 6 KVA UPS we have to provide a DC MCB for Battery bank of 16 nos (12 V 42 AH). What Shall be the current rating of DC MCB ?
give me applications of sequence bridges . (used in 3 phase un balanced systems)
Can Anyone suggest the Standards (IEC or IS) for selecting copper current density?
how to calculate the distance relay faulty zone?pls explain?
What safety precaution are to be taken for avoiding electric hazards ?
How much current will a 5 HP delta connected motor at no load will take?Is tat need a starter
For a stable system, where should the poles of a system be in a root loci plot?
what is negative d.c. voltage, why this voltage is used in base transciever station.
how we can set the IDMT relay.
Define resonant peak?
This is reqd for a 1MW Solar power plant..We have 2DC outputs from the solar panels Connected to 2INVERTOR panels.. Output from invertor is 3ph,280v,500kva,50hz.These are connected to individual ACB.This has to be stepped up to 11KV ,1250KVA SYSTEM.Now can I use (1) one more ACBTO GIVE A COMBINED OUTPUT OF 1000KVA,280V & STEP UP THE OUTPUT BY USING a single two winding 3 ph transformer 11kv/1250kva. or (2)use the two outputs and connect to one three winding transformer of above rating..Pls suggestwith details.
what is ic 01,ic 06 ?is it types of cooling?
if an insulated power and control cables of a running gas diesel gensets laid direct in an open trench i.e, trench bed is not rcc of a power house in which rain water, spillage water alwas exists and all power control cables remains submerged even when gas gensets of 480 kw each runningin on load. These power &control cables runs from power house to switchgear room through these trenches in which water remains most of the time. pl explain its merit & de-merit