Answer Posted / linu t. mathew
Management Information System.
It is for the purpose of informing quantity/values/amounts,
actually used/done, to the management every month, not to
clients and all.
| Is This Answer Correct ? | 15 Yes | 1 No |
Post New Answer View All Answers
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
Explain different types of rcc pipes.
Coverage of 25mm.thick ratio of 1:4 cement mortar?
States some of the commonly used commands in cad software’s?
What is dead load impact load live load
I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations
how much of the strength comes from post-production curing
What is hybrid foundation?
How is the strength of cement measured?
what is project?
what is kribs is supporting?
Explain major difference between auto level and dumpy level?
What is OSHA compliance?
How do you compute the volume of airflow?
During reclamation how can the occurrence of mud waves can be rectified?