Answer Posted / gowri
A pier is a raised walkway over water, supported by widely
spread piles or pillars
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
How does siphoning work?
Which is the direction for positive angle?
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
How much material is required for constructing a 2 Lane 2Km rigid pavement road
what does the grad of cement shows (denotes)?
Define a polyline?
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
how to conversation of all construction material in to brass
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
How much time Required for PPR pipe network testing
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
What is the Roll of Water Bonding under VDF road?
How many axes do cartesian coordinate system has?
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?