How to take Vector group test of Transformer?
Answer Posted / vinod
Vector group is punched on the name plate based on the user
requirement by the manufacture. Aim of vector group test is
at site is to check if their is any damage in the windings
during transportation and erection.
3 -phase AC supply is given on HV side. R-Phase HV and r-
phase LV shorted for all vector group of transformer
Then to qualify the test following conditions are to be
satisfied after measurement of voltages.
nR+nY=RY, By>> Bb and Yb=Yy.
| Is This Answer Correct ? | 19 Yes | 5 No |
Post New Answer View All Answers
Is there any type of starter for DC motor other than two point,Three point and Four point starters?
if voltage bt phase & nutral is 38v in a panel board . whats the root cause.
How does a television work?
How many double suspension hardware fittings are required on a double circuit transmission tower?
Why do we use center tap transformer that used with portable tools
why we have and use 3 phase not 2 or 4 or other in power system?
what is the breaking capacity and making capacity of circuit breaker and how
HOW TO DESIGN THE body EARTH cable(Copper Conductor) size for 60KVA UPS?
What is Phase to Phase clearance for 800V System Operating Voltage as per IEC61439
What kinds of decision are made about CT from it's Knee point(voltage & current)?
What is the instrument to check the rotating diode fuse of alternator in running conditions?
Atwhat condition reverse power relay will act?
How to set a Zone 1 distance relay for distribution feeder?
What is meant by load angle of an alternator? Upon what factors does the load angle depend?
I have a reading off 1.5ohms at my mem my main c/b is rated at 40/6 amps in a domestic house and i was told to change it to a b curve c/b is this ok