What is refurbishment order ? Explain the total cycle ?
Answer Posted / govind kiran kumar reddy
A Refurbishment order is made with reference Refurbishment
notification raised by a Planner who wants his defective
parts to be repaired or refurbished by an external vendor.
Refurbishment order is represented by PM04 and linked with
a settlement order, which becomes the work order raised by
the planner to withdraw the defective items from the
installation and replace with new or repaired.
Refurbishment order consists of a repairable or rotable to
be sent to repair workshop, once repaired is transfer
posted to stock as repaired for future use.
| Is This Answer Correct ? | 7 Yes | 5 No |
Post New Answer View All Answers
What is the maintenance plan? Different type of maintenance plans?
How do you distinguish, in a simple manner, between equipment that is being charged and not charged for service?
What are scheduling parameters?
What do you understand by data transfer between technical objects?
What is the business purpose of field authorization object in equipment master and functional location master?
What is a technical object in plant maintenance?
What is equipment master record?
Can we assign more than one maintenance item to a maintenance plan?
Which table would you use to extract the equipment and class information?
Can we change equipment category once defined?
How to configure system to allow notification type change?
Where is a service contract assigned to a piece of equipment?
What are different components under maintenance planning?
When you mistakenly enter wrong master data for an equipment, how do you manage this?
Where is a service contract is assigned to a piece of equipment?