what should be the age of father if his children was just
half of the age of father when he was 30
Answer Posted / sachin
3's ans is right
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Two lemons cost 10 cents. Then one and a half dozen cost
1/3 of girls , 1/2 of boys go to canteen. What factor and total number of classmates go to canteen.
Radha,Geeta&Revathi went for a picnic.After a few days they forgot the date,day and month on which they went to picnic.Radha said that it was on Thursday,May 8 and Geeta said that it was Thursday May 10.Revathi said Friday Jun 8.Now one of them told all things wrongly,others one thing wrong and the last two things wrongly.If April 1st is tuesday what is the right day,date and month? thought that he should not waste his time and started moving towards his residence at the speed of 3mi/hr.On the way,he gets the coach and reaches home at 6 o'clock.How far is his residence from railway station.
What is the probability of getting 3 or 4 in 3 consecutive rolls of a dice ?
The sum of the series 1 + 1(1+1/n) + 3(1+1/n)2 + ..... is equal to?
A man runs towards the east direction and then takes his right. Then he takes a left and again 50 degrees to his right. What is the direction in which he is moving now?
How many liters of water must be added to 30 liters of alcohol to make a solution that is 25%
find the next term 0, 6, 24, 120, -
9/10 or 10/11 which is greater.
Two chords of lengths L1 and L2 are drawn in a circle. Their lengths are inversely proportional to the straight distance joining the centre.Find the radius of circle.
total balls are z, the number of red balls is n and the remaining are blak balls,then the % of black balls equal to ?
Low temperature at the night in a city is 1/3 more than 1/2 hinge as higher temperature in a day. Sum of the low temp and highest temp is 100c. Then what is the low temperature
(Momentum*Velocity)/(Acceleration * distance ) find units.
if x=y=2z and xyz =256 then x=
A finishes a work in 12 days and B finishes same work in 14 days.If they work for a day alternately with A beginning, how many days will it take to complete the work?