how must steel will use for 1 cubic meter.formula of steel
for beam,column,lantern.
Answer Posted / cbsrinivas
for columns 2-3%
for slabs 0.5-1.5%
for beams 1-1.5%
for piles 2-5%
| Is This Answer Correct ? | 111 Yes | 31 No |
Post New Answer View All Answers
Explain the design for rcc multi-storied building?
What are the techniques to measure road difference?
What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
how can we calculate steel value, depending on load
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
How should we design a brick column and footing?(note: no reiforcement to be provided) Can you tell me any reference book where i could possibly find this design? Plz help urgently
What is Architect-Prepared Contract?
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
(Project Management Topic) What are the important criteria in the successful realization of the project?
Draw the cross section of a boundary wall and label its part with detailing?
how to convert sand in Cft to Kgs
What is meant by a context menu in a cad software?