Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Quality of first class bricks

Answer Posted / k bu babu

strength of the 1st class brick:105 kg/sq.cm
Water absorption in 24 Hrs.it should not be greater than 20%
of it weight.

Is This Answer Correct ?    46 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft

1882


Define aligned dimension?

1116


What Reinforcements Are Used In The Process Of Prestressing?

1326


How to calculate steel for beam slab and column

1849


How to increase a bearing capacity of soil?

1133


What is an object snap mode?

1180


What does civil status mean?

1191


How do we calculate absolute pressure?

1347


How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?

1920


how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm

2038


Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand

1824


What things architect have to take care of before starting any project?

1272


In cement concrete how to check a quality of material also proportion of material at site ?

1855


I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com

2343


while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.

1638