what are the costing parameter ?
Answer Posted / fareed ansari
Yes it is more or less correct
More precisely, costing parameters are
1) Routing: which delivers activity price & time
2) BoM: which is the contributor of standard material cost
against an order
3) Cost Centre: which is contributor unplanned material
issues against the production of FG/SFG.
| Is This Answer Correct ? | 13 Yes | 3 No |
Post New Answer View All Answers
What is the t-code for changing production order and to display production order?
Explain what is the need of mrp list if the stock requirement list is already given?
What is MRP group?
Which BOM item category you have used?
What is planning file entry
After doing realization how we will check whether it is working or not?
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
What happens to planned after it has been converted into production order ?
What is Inspection Points?
Can anybody explain to me why the work scheduling view is required for semi-finished and finished products?
How many levels of Flexible Planning are there?
Difference between Routing, Ref op set, Rate routing and Ref rate routing.
Can’t one material be assigned to more than one operation in a routine?
What is planning horizon?
What is a 'product hierarchy'?