Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

a)If column dimensions are 250*400mm , what will be
cutting length for 8mm stirrups and how to calculate it? b)
If beam dimensions are 200*400mm , beam coveris 25mm , slab
cover is 20mm , what will be the cutting length for
stirrups? c)Column dimensions are 250*400mm , reinf. is
12nos. bar of 16mm dia , stirrups provided are two legged,
what will be the length of each ring?

Regards

Answer Posted / santosh singh

1) let cover for column be 40mm (as u have not mentioned)
formula to determine cutting length of stirrup is given below
cutting length= (2A+2B)+(24D)
A=LONGER LENGTH OF COLUMN-2XCOVER=400-40X2=320MM
B=SHORTER LENGTH OF COLUMN-2XCOVER=250-40X2=170MM
D= DIAMETER OF STIRRUP BAR IN MM
therefore
cutting length=2X320+2X170 + 24X8 =1172MM=1.172 meter
2) given cover 25mm (as u have mentioned)
formula to determine cutting length of stirrup is given below
cutting length= (2A+2B)+(24D)
A=LONGER LENGTH OF BEAM-2XCOVER=400-25X2=350MM
B=SHORTER LENGTH OF BEAM-2XCOVER=200-25X2=150MM
D= DIAMETER OF STIRRUP BAR IN MM
therefore
cutting length=2X350+2X150 + 24X8 =1192MM=1.192 meter

NOTE SLAB COVER HAS NOTHING TO DO WITH CAL.OF STIRRUPS
3) ASSUME cover 30mm (as u have NOT mentioned)
formula to determine cutting length of stirrup is given below
cutting length= (2A+2B)+(24D)
A=LONGER LENGTH OF COLUMN/2 -COVER=400/2-30=170MM
B=SHORTER LENGTH OF COLUMN-2XCOVER=250-30X2=190MM
D= DIAMETER OF STIRRUP BAR IN MM
therefore
cutting length=2X170+2X190 + 24X8 =912MM=0.912 meter EACH

NOTE I HAVE CONSIDERED 8MM DIA STIRRUP BAR EVERY WHERE
UPTO 12MM DIA BARS CAN BE USED AS STIRRUPS GENERALLY
i am a civil engineer. if u r a civil engineer i think u should
by a bookits name is

estimation and costing by B.N.DUTTA u will get alot of
information through this book ....i think no one has been able
to explain the correct method ....good luck

Is This Answer Correct ?    245 Yes 60 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How is make concrete cube?

1188


pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width

1564


What is the density of DLC & PQC and how it is differ from normal concrete?

3707


What are the different types of civil engineering?

1137


how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .

2716


Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.

1738


Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.

1905


What is the distance between railway tracks?

1236


How many days should curing of plastering, brick work and concrete

1664


Why are the bolts that hold steel rails together in oval holes?

1129


how can we construct building without foundation providing only grade beam at ground level

1672


HOw much % of premium on DSR-2013 currently

1944


what pressure the NP2 class RCC pipe can sustain?

2688


what is the hanekom repairing material after concreting work

2392


how much required strength of cement concrete bricks(size 230x115x75mm)

1972