"U2" has a concert that starts in 17 minutes and they must
all cross a bridge to get there. All four men begin on the
same side of the bridge. You must help them across to the
other side. It is night. There is one flashlight. A
maximum of two people can cross at one time. Any party who
crosses, either 1 or 2 people, must have the flashlight with
them. The flashlight must be walked back and forth, it
cannot be thrown, etc. Each band member walks at a
different speed.
A pair must walk together at the rate of the slower man's pace:
Bono: 1 minute to cross
Edge: 2 minutes to cross
Adam: 5 minutes to cross
Larry: 10 minutes to cross
For example: If Bono and Larry walk across first, 10 minutes
have elapsed when they get to the other side of the bridge.
If Larry then returns with the flashlight, a total of 20
minutes have passed and you have failed the mission. Notes:
There is no trick behind this. It is the simple movement of
resources in the appropriate order.
Answer Posted / janeel
Bono and Edge go over, Bono comes back = 3 minutes
Larry and Adam go over, Edge comes back = 12 minutes
Bono and Edge come back = 2 minutes
from:http://www.u2faqs.com/fans/
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
How will you conduct risk analysis?
hi frens, i need ur help if nebody had worked or workin on online banking projects n online job portals ..frens cud u pls gimme the realtime examples for critical bugs, high severity n low priority bugs high severity n high priority bugs low severity n low priority bugs high severity n low priority bugs related to banking n job portal
Explain branch testing?
What is test case generator?
HI Any one can guide me What is database testing ? And How will do it . Please refer me any site or document to know more abt data base testing.
What is a vertical microinstruction?
HOW TO PERFORM DATABASE TESTING
What is life cycle?
'This life cycle model is driven by schedule and budget risks' this statement is best suited for.
What is the difference between test matrix and traceability matrix?
What is the step you would follow once you find the defect?
What is a test closure?
When is used decision table testing?
I am having 1.5 years of exp. in Manual testing.What I have to do now? Should I do ISTQB Certification or Perl/Shell Scripting Languages? OR Anything else.Please Guide me properly.
What is the difference between preventative and reactive approaches to testing?