IN CIVIL ENGINEERING DESIGN WHY WE ARE USING LIMIT STATE
METHOD IS BEST?
I THINK WORKING STRESS METHOD IS BEST?
EX; FOR COLOUMN DESIGN IN LIMIT STATE METHOD AST
IS;1913SQ.MM
SAME TIME WORKING STRESS METHOD IS ;2213.
SO I THINK WORKING STRESS METHOD IS VERY STRONG COMPARE
THEN LIMIT STATE METHOD?
MY OPENING IS CORRECT OR NOT? PLS TO EXPLAIN SIRS
Answer Posted / veera
working stress design is more conservative than limit state
method.concrete being a brittle material high factor of
safety is adopted (i.e-3).it is a stress approach,in case of
limit state partial factor of safety is used load is
factored and this a strain approach.
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
Are you ready to relocate with your immediate family to United States as a new employee?
What is zoning permit?
please briefly explain calculating or estimating steel quantity for a RCC column?
how to calculate mivan shuttering matrial
What do you mean by tolerance factor of concrete ?
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
How to calculate volume of concrete & steel on tank foundation & ring wall ?
How to design staircase.plz tell me formula for the design the staircase.
What is the use of extend command?
How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight
I need to do a Compressive Strength Test for a specimen made of Rubber. Before doing the Test on the Machine, I need to have an idea of the Minimum and Maximum Compressive Strength or Yield Strength of the specimen. How can I calculate that?
Which code is used for tor & tmt steel bar?
What is an ortho mode?
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
What is the difference between yeild strength and compressive strength of steel???