hi,
how would i run job1 then job 3 , then job2 in a sequence of
job1 ,job2,job3.

Thanks
sunitha

Answer Posted / ranjith reddy

hi
sunitha

by using trigger condition
move job1 to job3

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the different options associated with dsjob command?

935


Can we use target hash file as a lookup ?

2814


i WANTED TO USE THE RANGE LOOKUP SCENARIO IN DATASTAGE 7.5.2 SRVER JOB.i HAVE A DATE FIELD IN SOURCE AND I SHOULD MATCH IT WITH A FIELD IN LOOKUP FILE.BUT,THE FIELDS SHOULD MATCH EVEN THOUGH THERE IS SOME RANGE.CAN SOMEONE TELL ME HOW CAN I DO THAT. THANKS

3309


How to implement complex jobs in data stage?

612


What is meta stage?

577






options available in sequence job to run,validate?

832


WAT TYPE OF PL/SQL QUERRYS USED IN DATASTAGE

3263


Can you filter data in hashed file?

3341


Field,NVL,INDEX,REPLACE,TRANSLATE,COLESC

963


Why we use surrogate key?

697


Have you used Unstructured data?

829


How will you load you daily/monthly jobs datas in to Fact and Dimension table using datastage.

2987


how to use self join using datastage ? can u tell me using stage how can we implemnet the self join

4558


what is flow of project?

1557


What is the difference between orabulk and bcp stages?

571