Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What are the conditions to be satisfied before connecting
two DC generators in parallel?

Answer Posted / bharat3832

those two machines should have same output voltage and in
same frequency

Is This Answer Correct ?    2 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is magneto on a gas generator. how it functions. its out put is d.c or a.c. how it can be checked for correct functioning

2009


what are the types of electromagnetic forces developed in practical transformer?

2629


sir,in our plant we r using SATEC PM172E power reading meeters in HT panel side it is monitoring the MB data smart viewer(sever).but last one week we did not get readings inthe server only available in meeter.tell me how communicate meter and server. and also what steps we take for checking.

2224


why the neutral line is not giving shock to us if we touch it ?

1778


explain remenance . differentiate high remenance type ct & low remenance type ct

2127


How to apply 'c' license and also explain what is difference between 'c' and 'b'license.i am also working in one of the private company.i have finished my diploma in 2014 .i have already finished in ITI electrician course.....

2018


Draw a SLD for main panel for school having connected load of 1200kw and emergency generator 200kw.also show the increase of additional load of chiller 225kw in the lv panel indicating meter postion size of transformer ,cables and capacitor bank.

976


what will happen if synchronous machine rotor fed from single phase ac supply 

1740


why does rotor rotets?

2623


what is a bus post insulator? explain its application in a substation.

12602


Please tell me the formulaes while designing a substation for power Calculations in designing a 33 KV Substation?????

1816


Dear Respected sir how to test ABB REX521 protection relay by relay tester.

2747


What is ramp signal?

1105


L.A. (Lightening Arrester) is located at a place from where transmission line enters the transmitting substation. So L.A. (Lightening Arrester) is the first equipments which has to encounter with lightening, high voltage surges and switching surges. It has to absorb energy of lightening, high voltage surges, and switching surges. L.A. (Lightening Arrester) is made up of layers of semiconductors. If these layers can not tolerate energy released by lightening, high voltage surges, and switching surges the L.A. (Lightening Arrester) blasts.

1100


what is the formula for hv test for cable and circuit breaker..????

2038