why we use minimum cement as given in IS mix design code
Answer Posted / manoj patel
If we do not use minimum content of cement say for example
of M20 concrete; then it will not serve the purpose ie to
achieve comp.strength desired/intended for;
Hence min req. is the lower limit of material content.
Like minimum calory req. by our body to sustain life;
regardless of age, type of work, etc.
| Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.
Discuss some applications of modular elasticity?
1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.
How can you achieve soil enforcement?
why we can use dust in concrete insted of fly ash
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
How to calculate the load of partion in flat slab if we use brick?
what is the permanent solution applied for restoration of leaning tower of pisa?
Define aligned dimension?
what is floating slab foundation?
How to design staircase.plz tell me formula for the design the staircase.
What is bylayer?
At what point does a circle start losing area when being flattened?
what is shuttering co efficient?
How many axes do cartesian coordinate system has?