Hi All,
This is regarding ETL testing. I have 3.5 years of
experience in software testing. I have used web and DB
testing so far. I am currently projected for ETL testing by
using which is very new to me. We are using Informatica for
running the sessions and taking the logs. I would like to
know whats the process we have to follow for this testing.
Ie., From kickoff to signoff. Can please anyone give brief
explanation on that.
Do we have any certification for ETL Testing??
Answer Posted / ankit
Hi Can you please send me the document too at
ankur_aneja@hotmail.com.
Thanks
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Explain what test deliverables is?
Mention what bottom-up testing is?
What is the difference between model based testing and state transition testing? Or are they the same?
what do i expect in a second interview for a system tester position
What is quality system?
Could reviews or inspections be considered part of testing?
Which one you prefer, working with independent testing project or working along with development team?
In white box testing, what do you verify?
What is the objective of regression testing?
In which phase should testing begin – requirements, planning, design, or coding?
The purpose of the requirement phase is
Mention what the main advantages of statement coverage metric of software testing are?
What the basic components of defect report format are?
Please Check out and Answer the Questions in Networking section. It's argent.
Explain verification?