if in a level tx height is given, how u calculate the ranges
of the tx?

Answer Posted / s. kanniyappan

In case of Dry Leg
Span = (X)(Gl)
Hw at minimum level = (Z)(Gs)+(Y)(Gl)
Hw at maximum level = (Z)(Gs)+(X+Y)(Gl)

In case of Wet Leg
Span = (X)(Gl)
Hw at minimum level = (Y)(Gl)-(d)(Gs)
Hw at maximum level = (X+Y)(Gl)-(d)(Gs)

Gl=Specific gravity of tank liquid
Gs=Specific gravity of seal liquid
Hw=Equivalent head of Water
X=Max level
Y=Min level
Z=Distance b/w Datum and Transmitter.

Is This Answer Correct ?    0 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the types of control valves available

1526


What are different types of orifice plates? State their uses.

627


what is a good line as ic engineer as maintenance ,oc, project, calibration ,validation engineer?

1475


how to work static pressure sensore how to work dpt

1392


What is shielding effect?

1748






which processor is used in dcs.

1814


what is different between 2,3&4 wire rtd and how much maximum distance using plc to field.

2268


What is furnace draft control?

628


Identification of ss fittings, pilot valves, relief valve.

1383


Explain PID, ON/OFF, Controls

1575


We Have Two Field bus Pressure Transmitters of Different Sensor Range (I.E One is of Lower range and Another is of Higher Range).Is same Process Line. My Question is Can i provide Saturation Limit to my field Bus Transmitter as We can provide Saturation current limit to HART Instruments. As During Low Pressure Both Working OK ,But During High Pressure, transmitter with Lower sensor range Goes to Fault mode as Beyond its Sensor Limit it can Measure, So may I provide Saturation point Some where to Suppress This Fault during High Pressure.

1130


please can any one tell me clearly about pid tuning i am confusing about this .how to tune pid easly?

1679


i need some objective type questions in instrumentation

4470


Why flow/pressure transmitter before control valve?

1054


Isometric drawings are generated during _________________ phase of a project

1605