How do you derive the quantity of cement & sand in brick work
construction in 1Meter cube, using CM 1:6 and bricks of size
19*9*9 cm
Answer Posted / sag
Volume of bricks with mortar=.2*.1*.1=.002
No of bricks=1/.002=500
Volm of 500 bricks=.19*.1*.1=.7695
Volume of mortar=1-.7695=.2305
Add 15% for wastage and 30% for dry mortar
Now volume of plaster=.2305+.2305*.15+.2305*.3=.334
1:6 cement and sand 1+6=7
Volume of cement=1/7*.334=.048m3=1.36 beg
Volume of sand= .048*6=.288m3
Is This Answer Correct ? | 33 Yes | 5 No |
Post New Answer View All Answers
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
Explain the difference between shear and tensile strength.
What is the primary difference between adsorption and absorption?
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
What is eccentricity in laymans term Can't understand bookish language .please explain in easy way.
In jack arch floor, the rise is kept?
how to calculate rate analysys of 1:6 plastering 10 sq m
how clculate excavated or backfilling quantity by simpson's rule
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
What are the disadvantages while using stone dust as filler in pavements?
Explain what is 1/8 on the architect ruler denotes?
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
please send me bhel questions on rupesh.017@rediffmail.com