Answer Posted / nilesh ghadge
M-30 IT MEANS THE COMPRESSIVE STRENTH OF THAT CONCRETE IS
30N/MM2 AT 28 DAYS
| Is This Answer Correct ? | 13 Yes | 0 No |
Post New Answer View All Answers
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.
how many types of survey and what are levelling instrument?
Please design 12.5m long dubbly beam
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
What is rate of concrete surface rendering work per sqm
Where is the worlds longest elevator and how long is it?
How much quantity of rod binding work by a rod binder per day
whou haat goals do you have in your career
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?
How is the leaning tower of pisa supported?