How to defind P.C.C. mix design according ratio & IS coad
Answer Posted / mani
any concrete with out reinforcement is called PCC. Ratio of
PCC is may be 1:2:4 or 1:4:8 or 1:3:6
Is This Answer Correct ? | 146 Yes | 20 No |
Post New Answer View All Answers
how to do cementicious paint for rcc walls of cw pump house
Explain creep?
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
what are the types of design? which type of method is used at what type of design & why?
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
Difference between pre-tensioning and post-tensioning.
When column of building is abutting the boundary line,then suitable footing advised is
Give me an example of a time when something you tried to accomplish and failed.
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
What are the alternate material for steel, Sand and aggregate
Why Should Curing Not Be Done By Ponding And Polythene Sheets?
How many lbs are there in a yard?
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
Exterior Joints,define
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam