3x + 4y =15 so what is the slope of line which is
perpendicular to this line.?
Answer Posted / ravi
3x+4y=15
4y=-3x+15
y=-3/4x+15
m=-3/4
Slope of a |r line is m1=-1/(-3/4)
=4/3
| Is This Answer Correct ? | 13 Yes | 0 No |
Post New Answer View All Answers
The day before yesterday was WEDNESDAY then the day after tomorrow is?
f(X)=4f(X-1) THEN VALUE OF X=
In a helpful book on the indexing and searching of text-based electronic files, a well-respected computer scientist differentiated _____________________ search efficiently using augmented inverted indices. latent semantic indexing, which is a technique designed to analyze relationships among the words within documents, with vector space models, which can between latent semantic indexing, which is a technique designed to analyze relationships among the words within documents, and vector space models, which can between latent semantic indexing, which is a technique designed to analyze the relationships among words within documents, with vector space models, which can latent semantic indexing, which is a technique designed to analyze the relationships among words within documents, and vector space models, which can
there is a safe with a 5 digit No. The 4th digit is 4 greater than second digit, while 3rd digit is 3 less than 2nd digit. The 1st digit is thrice the last digit. There are 3 pairs whose sum is 11. Find the number.
a radioactive material of mass 16 grms in 10 years due to radiation. how many years will it take for the material to attain a mass f 1 gm
The price of Machine D equals the sum of the prices of machine A, B and C whose price are in the ratio 2:3:4 respectively. If weights of A, B, C and D varies as square of its individual price and difference of weight of D and A, B and C together is 9880 kg. Then what is the weight of D?
f(f(x))=81 THEN VALUE OF X=
The ratio of the length : breadth : height of a cuboid is 5 : 4: 3, and the volume is 7500. What will be its surface area ?
A can do a work in 8 days, B can do a work in 7 days, C can do a work in 6 days. A works on the first day, B works on the second day and C on the third day rely. that is they work on alternate days. When will they finish the work.(which day will they finish the work) (7+7/168)
In how many rows will 200 Miranda bottles be placed, if 200 Miranda bottles are stacked in such a way that there are 20 bottles in the bottom, 19 in the next row, 18 in the row next and so on?
two persons run a race of 100m. the winner won by (110/11)m and one second in time. find the speed of lsoer in met
Find the next letter in the series A,C,F,J,0--
In a digital circuit which was to implement (A B) + (A)XOR(B), the designer implements (A B) (A)XOR(B) What is the probability of error in it ?
Mahesh and Ramesh are questioners. The time taken by Mahesh and make a question is double of that taken by Ramesh. If Mahesh made 3/2 questions less each minute and Ramesh made 3 questions less each minute, to make m questions, the time taken by Ramesh would be 2n minutes less than that taken by Mahesh. If Ramesh takes n minutes to make m questions, find the number of questions that Ramesh can make in a minute?
The sum of the digits of a two digit number is 8. When 18 is added to the number, the digits are reversed. the number?