How can we cross check the excavation and backfilling
quantities.
Answer Posted / sjtbehera
cross check of these items are not possible where
everything done. you can take theoritical value or actual
cutting
Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
what is Brest Wall?
how much used soil in 1 brick of standard size?
Cement consumption of one cubic meter of aerocon blocks masonry?
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
What are the reasons for geotechnical site investigations in uganda?
Which Types Of Bricks ?
What are the advantages of building a dam on the river nile?
How do we calculate absolute pressure?
Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.
what is the water-cement ratio of mix design while 30mpa in 7 days?
door and window wood work calculations and different methods