How can we cross check the excavation and backfilling
quantities.
Answer Posted / sjtbehera
cross check of these items are not possible where
everything done. you can take theoritical value or actual
cutting
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
Trapezoidal section footing calculation of Volume & its Area
The definition of national highway
What is the substitute of Mastic Asphalt?
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
Reinforcement details at hinged joint
The foundations are placed below ground level, to increase?
how to calculate the scour depth
what is the hanekom repairing material after concreting work
Is it possible to make a feature using an overdefined sketch?
Define What is made from large rocks, which protects the base of cliffs?
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
what is the formula for Mass of cement grout (Dg)=???
What are the responsibilities of a construction manager?