How can we cross check the excavation and backfilling
quantities.
Answer Posted / sjtbehera
cross check of these items are not possible where
everything done. you can take theoritical value or actual
cutting
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
In which code the the maximum height of concrete casting has been explained
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
what is the use of beam end forces while using a staad ? wha they are show
what is grade intersection?
Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted
HOw much % of premium on DSR-2013 currently
as per is code, what is the minimum content of opc and ppc cement for rcc structure
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
2. What are the advantages of your present job, things you like about it?
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
WHAT DLC DESIGN IN CONSTRUCTION
What are the different methods for drawing an arc?
What is critical path method (c.p.m)?
What black man invented the clothes dryer?
Why are separation membranes used between concrete pavement slab and sub-base?