What do you mean by "M-30"?

Answer Posted / punit

M means mix.
30 represents 28 days compressive strengh of concrete.

Is This Answer Correct ?    17 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how many types of survey and what are levelling instrument?

1540


residential projects,structural.

2394


how to absorb to site basic corrections? which are the important correction?

981


how do we design mix ratio?

1410


Basic civil interview questions 

1845






Calculation of curtain wall of box culvert

5301


Gidc technical que paper

1246


How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?

1359


57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11

9037


types of laps in column

1900


My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).

2604


what is tension column?

1545


I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????

1640


what is parametre for M25 after 7 days strength

1508


Differentiate first angle & third angle projection?

639