Answer Posted / punit
M means mix.
30 represents 28 days compressive strengh of concrete.
Is This Answer Correct ? | 17 Yes | 0 No |
Post New Answer View All Answers
how many types of survey and what are levelling instrument?
residential projects,structural.
how to absorb to site basic corrections? which are the important correction?
how do we design mix ratio?
Basic civil interview questionsÂ
Calculation of curtain wall of box culvert
Gidc technical que paper
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
types of laps in column
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
what is tension column?
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
what is parametre for M25 after 7 days strength
Differentiate first angle & third angle projection?