How can we cross check the excavation and backfilling
quantities.
Answer Posted / praman srivastava
In case of foundation like Load Bearing , Isolated footing
or raft , Total excavation calculated as per plan & require
depth form NGL & deduct the total qty of pcc cc or B/w up
to NGL,then total balance qty is known as backfill.Approx
60% qty.of excavation is required for back fill.
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?
how much repeitation for conventional and maivan formwork?
How can explode a block?
What is the quantity of cement in mix m20 concrete?
Why nautical mile is different from statute mile?
whou haat goals do you have in your career
What is the procedure of concealed plumbing in toilets?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
How can you distinguish between sorption, absorption and adsorption?
What is the absolute pressure scale?
How to calculate laplength for 3 floors
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
Explain the latest method to detect a crack in a building?