how many binding wire can be required for 1 metric tonne
steel?
Answer Posted / das
15 to 20 metric tonne
| Is This Answer Correct ? | 3 Yes | 42 No |
Post New Answer View All Answers
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
In cement concrete how to check a quality of material also proportion of material at site ?
what is tension & compression of steel bending.
The mixture of different ingredients of cement is burnt at?
What expenses counted in contingencies and how much it is in related to built-up area of the building.
Civil engineering related
what is differences between ferrock and concrete ?
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
What is the method of soil replacement test?
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
What you understand by richter scale?
how much percent are used 20mm,10mm?
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?