a)If column dimensions are 250*400mm , what will be
cutting length for 8mm stirrups and how to calculate it? b)
If beam dimensions are 200*400mm , beam coveris 25mm , slab
cover is 20mm , what will be the cutting length for
stirrups? c)Column dimensions are 250*400mm , reinf. is
12nos. bar of 16mm dia , stirrups provided are two legged,
what will be the length of each ring?
Regards
Answer Posted / anthony victor bernard
a)250-column cover both side+8*dia of rod
400-column cover both side+8*dia of rod
so cutting length is (.200+.350)*2+(2*5*.008)
=1.180 mts
(b)cutting length is (.150+.355)*2+(2*5*.008)
=1.090 mts
(c)cutting length is (.100+.350)*2+(2*5*.008)
=0.980 mts
| Is This Answer Correct ? | 11 Yes | 38 No |
Post New Answer View All Answers
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.
How to calculate material and labor required for 100 m2 plaster?
I have an span length 16 ft c/c
Calculation of Pier Cap with tapper area?
What is the procedure of concealed plumbing in toilets?
what is labour consume factor in residential projects
Permissible wastage of cement as per IS code ? In which IS code I get it?
Define Workability ?
what could be the production cost of 1 cum of concrete by CP30 plant
What are some facts about concrete?
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
five benefits of using standard terminology in the measurement process
The 4 main factors to start a construction project are––