What is the difference between STATIC CREDIT and DYNAMIC
credit
Answer Posted / arvind
Static:
Static credit control takes into account the open orders
and deliveries while calculating the credit limit.
One may choose to pick any one of the option or both.
Dynamic:
Dymanic credit control taken into account open order,open
deliveries and open billing docs while calculating the
credit limit. Here the option to specify 'Horizon (Time
period)' is available. We may choose Horizon to specify the
time limit in months, days or the the other avilable option
for credit limit, which necessarily means that only the
open docs which falls within the specified time horizon
will be considered.
Horizon: We cannot change the horizon the Automatic control
screen. One need to use t code: OMO1 and the select Info
set S066 and change the horizon which would subsequently be
reflected in the automatic configuration.
Hope ti would help
| Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
What is the 'consignment stock process'?
What is the difference between a sales activity and a sales document?
What is the relevance of tab 'Weight/ Volume Relevant' during Credit Memo Request and Debit Memo Request as it is being checked in both process at item level? As I know, it is relevant for re-determination of route at delivery level.
Can anyone please give an example of writing functional specification for a particular situation?If you can't think of it, here is an example : How do we write a functional specification for the FITGAPS raised in the business system? I know a functional spec, is a detailed description. But realtime gurus, pls give a realtime functional spec for such a situation for me to understand more on this.Thanks a bunch in advance!
When you create an invoice can you carry out pricing again?
If you generate bill more than credit limit then what will happen?
Explain what is sql override for a source table in a mapping?
What is a client?
What are the responsibilities of a functional consultant in an implementation project?
9. Any three major issues faced in the support project? what kind of issues they were
What happens when the exclusive field was ticked in the access sequence?
how we will configure export sales in sd (respect to plants assign and sales process)?
Can any one explain how we will configure milestone billing , periodic billing and which scenario we will use?
A Client wants to connect his SAP ECC system to his SAP CRM system. What do you want to do to enable the integration. a)Install the plug-in on the CRM system and connect to the R/3 adapter in the ECC system b)Install the XIF adapter on the CRM system and connect to the R/3 adapter in the ECC system c) Install the XIF adapter in the ECC system and connect to the R/3 adapter in the CRM system D)Install the plug-in on the ECC system and connect to the R/3 adapter in the CRM system
how to define and assign value for mini oder value (amiw) condition type and which field cateloge we suppose to choice in v/03?how amiw and amiz work together?