IS RTCC AND OLTC REQUIRED FOR 500 KVA 11KV/433V TRANSFORMER
FOR AN INDUSTRY?
Answer Posted / karthick g
OLTC-ON LOAD TAP CHANGER,WHICH USED TO CHANGE THE TAPPINGS
ON LOAD,BUT THE OPERATION CAN BE DONE MANUAL,BUT ON OFF
LOAD CONDITION.OTHER OPTION IS OFF CIRCUIT TAP CHANGER.OLTC
OR OFF LOAD YOUR CHOICE.BUT IF OLTC THEN RTCC ALSO REQUIRED.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Define settling time.
how to wiring it with contactor and timer together
when the Transmission and Distribution network where is the "feeder" lines are located? and why should be used in T&D network.....
Why neutral point is consider as zero potential?
WHAT IS DIFFERENCE BETWEEN MANUAL CONTROL AND MAGNETIC CONTROL AND STATE ITS ADVANTAGE /DISADVANTAGE
What are the types of power in electrical power?
PLEASE INFORM ABOUT THE IDEAL TEST RESULTS OF MAGNETIC BALANCE TEST OF TRANSFORMER 33/11 kv DELTA-STAR T/F
What is s-domain and its significance?
What is the efficiency during maximum power transfer?
how to interlock 3 nos MCCBs using under voltage coil. please provide me circuit diagram?
Does the motor power displayed on the Motor name plate is the mechnical power motor delivers or it is consumed power from the system?
in parallel operation of power transformer why the distance between power transformer and capacitor bank feeder is necessary to know
Following test should be conducted to find out relative polarity of transformenr terminals A no load test B back to back test C phasing out test D none of above
1.what is the funtion of chiller primary & scondary pumps. 2.what is the use of distribution lines & Types. 3.what is the use the thermal power stations & how much capacity.
explain the Trip supervision circuit