Dear Friends,
I have a 500KVA transformer supplying whole factory having
3 phase and single phase mixed loads. Power room has
ammeters connected via CTs for individual phase. Now I know
that readings shown on meter for each phase say R,Y and B
are line currents. But when I want to know the total on
transformer do I need to add the currents of all three
phases readings shown on meter or value for anyone phase
will give me the correct power load on transformer for that
point of time.
2. If ammeter shows unbalanced readings for R,Y, B phases
say 150, 250 and 300 respectively so can I assume that 150A
i.e average of 3 will be the 3phase load currents and
remaining will be 1phase currents. Please clarify my doubt.
Answer Posted / ahmadmukhtiar
1. The load of R, Y or B will be the total load on
transformer.
2. There must be phase balancing system for protection
otherwise the equipment connected as load will get damaged
if all three phases are unequal.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How can find thermal state value in relay for calculate thermal overload.
What are locations arc protection relay is fixed.
What are conduct on the testing in cf in ur site?
Whether IP65 enclosure box blocks ventilation if driver for LED have to enclosed inside IP65 box
sir i applied for hpcl(electrical).i want to know from which subjects most of the technical que will b asked.and pattern of the written test.pls help me
What is the basic rule for block diagram reduction technique?
primery try cell?
I have motor 1500 HP and , 4160 V , 60 HZ , then i need the rating of transformer which can feed that motor ??
what is difference between line differential and transformer differential?
how we test a 3 phase motor on single phase supply....? HOW WE RUN A 3 PHASE MOTOR ON SNIGLE PHASE. supply for testing..? how we verify of a 3 phase motors 6 wire & name thame a1/a2/a3..b1/b2/b3 and c1/c2/c3 for connecting star delta starter ........i have only 1 phase supply ? help forum..........
what is the use of current transformer in power transformer secondary side.?its connectyed in WTI
after how many spot we must chang secondry cable in portable spot welding gun?
WHY CBCT USE ONLY IN Y PHASE NOT OTHER PHASES
what is current check gurd relay?
What are the two major types of control system?