Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

in construction feild make the column rods are uneven ( e.g
1 column we have 6 nos of bars that 6 nos of bars are
varrious level- 1 bar 10';2 bars 9';3 bars 8') what is
resion to put different level if difference are required or
not?

Answer Posted / santosh singh

the steel rods should be in zig-zag position and all the
steel rods should be over lapped at different places.
the steel rods should be minimum 300mm in level difference
and the lap should be provided iner centre of column

Is This Answer Correct ?    3 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Please let me know what is the simplest way of Calculating Mix Designs

1987


what is concrete canvas?

2268


What is the general specifications of a bituminous pavement road?

1684


What glue is least sticky?

1207


Define What is aggregate?

1153


What are some facts about concrete?

1152


what is the effect of duration of earth quake on framed structures ?

2228


How to get MEP technical,instaaltion & testing data for interview?

2142


20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks

2702


What is the use of array command?

1192


Describe the various methods of concrete curing?

1122


what is pouring and explain

2335


please briefly explain calculating or estimating steel quantity for a RCC column?

1938


What is meant by cartesian coordinate system?

1145


My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).

3030