what is mean by single phasing used for electrification in
rural area of maharashtra ?
Answer Posted / vanthni@yahoo.com
in rural area in Maharashtra we give single phase power
supply only
but the three phase power supply is split in to consumer
by single phase ok
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
CAN WE CALCULATE THE NEGATIVE SEQUENCE AND ZERO SEQUENCE REACTANCE OF A GENERATOR USING ONLY ITS RATED VOLTAGE, KW, PF AND SYNCHRONOUS REACTANCE??? IF YES, THEN HOW??
In all analog voltmeters or ammeter showing some small size symbols. as well as a star and in star 2no. digit, resister symbol,and other. what is that's meaning ?
What is the source of dependent source ?
What is the end effect of linear induction motor ??
how to design the heater in temperature control unit to heat 50KL of water?
WHAT HAPPENED DC SERIES MOTOR FIELD WINDING OPEN. CAN POSSIBLE.
what is high - pot test. what's its use?????
What are locations arc protection relay is fixed.
what is the difference between fault current ant short circuit current?
Sir,In our company there are 3 caterpillar make(capacity:(1) 3.3KV,2.5MW(2)3.3KV,2.5MW & (3)3.3KV,1.9MW) & 1 deutz make (capacity:11KV,3.8MW)gas engines utilised,all are running in paralell. There are three transformer utilised,(1) 6.25MVA,3.3KV/22KV,Impedence voltage:6.7% used for two generator,both are 2.5MW(2)5.5MVA,3.3KV/22KV,Impedence voltage:7.2% used for one generator of 2.5MW & (3) 5.5MVA,11KV/22KV,Impedence voltage:7.8% used for one generator of 2.5MW.all generator breakers capacity of 1250Amps. Sir,I want the details of fault level calculation of generator,transformer individually & for whole system. If you require any information from me.feel free for contact me sir.pl.send the answer of my question as the earliest as possible.
Explain what is clipper and clamper circuits?
We have received supplies of the ordered material. payments against the supplies also released. Where ST paid 4% against form C. Meanwhile it has been observed that 25% of material supplied was defective. Please suggest whether the issuance of C form from our side would be stopped till settlement of liabilities.
what is two point starter?
can the measured percentage error during calibration of single phase energy meter be negative?
Why neutral point is consider as zero potential?