Answer Posted / d.pradeepa
It is a part of the structure uesd to carry and transfer to
the load of the structure to the bearing ground located at
some depth below surface.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Explain what is progress payment?
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI
what are the duties of Site Engineer in work site?
mix design procedure for 1:6 cement mortar
any book or article on pumped concrete.
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
For the construction project what capital cost has to be taken in consideration?
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
how much shouid be the rate for ready mix concrete per cubic meter
Gidc technical que paper
how we calculate the grade of the Bituminous materials.?????
For Granite Flooring,For Cement Slurry purpose which one is effective of cost control whether OPC or PPC or White cement?
Basic civil interview questionsÂ
how to stop beam concrete between column
Explain how you can turn off the display for dimension in CAD?